The standard fastening pattern is permitted over the rest of the sheet.
Corrugated metal roofing installation details. Be sure the larger edge is laid so that the small edge of the next panel will overlap it. Measure the length of the roof and the breadth of one side. Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line. Valley and snow design.
Without getting up on the roof itself you can get the measurements simply by measuring the. When a metal roofing sheet must be installed on a curved roof screws should be installed at every overlapping rib at the sheet ends to resist the natural tendency of the metal to spring back. It is recommended that 7 8 corrugated panels have a minimum slope requirement of 3 12 on all structures. Installation of residential corrugated metal roof systems usvi ra3 march 2018 page 2 of 9 construction mitigation g uidance this section provides the following.
Pre drill holes on the ridges. Cut the panels to the desired length. When a metal roofing sheet must be installed on a curved roof screws should be installed at every overlapping rib at the sheet ends to resist the natural ten dency of the metal to spring back. Buy the metal panels.
Examples of corrugated metal roof assembly problems that were observed after the 2017 hurricanes wind design criteria for roof systems roof system installation details. Most panels come up to 32 feet 9 8 m in length. Some panels have pre drilled holes. Corrugated metal roofing generally comes in sheets that are 3x6 feet in size 18 square feet.
Metal roofing specifications cad pdf drawings testing bim. Depending on the area of the roof you can use different sized panels. Although you can install corrugated metal roofing over shingles for the best foundation it is recommended that all the old roofing be removed. Installing corrugated roofing 1.
Corrugated metal roof installation instructions step 1. For added protection from rain and snow it is recommended to use rubberized ice and water shield on eaves valleys and areas of roof penetrations. Start at the highest point and the furthest point from the trash container and take off all the old. Before you start to install corrugated metal roofing you need to figure out how much you need.
You can either buy. The standard fastening pattern is permitted over the rest of the sheet. When installing the metal panels shown in this booklet over a curved arch the minimum. Also for exposed fastener panels wall panels tiles soffit fascia copping.